Port Shore-Power & Distribution — Burgas Marine Terminal
Shore-power pedestals, HV cable distribution, and cold-ironing infrastructure for a Burgas Black Sea marine terminal.
Project Milestones
Design & Engineering
Feasibility study, schematic design, permit submission, and equipment specifications finalised.
Design & Engineering
Feasibility study, schematic design, permit submission, and equipment specifications finalised.
Manufacture
Factory assembly of switchgear panels, transformer station enclosure, and cable management systems.
Manufacture
Factory assembly of switchgear panels, transformer station enclosure, and cable management systems.
Site Installation
Civil works, equipment delivery, installation of primary and secondary systems, cable termination.
Site Installation
Civil works, equipment delivery, installation of primary and secondary systems, cable termination.
Commissioning & Handover
High-voltage testing, protection relay settings, grid connection approval, and client handover.
Commissioning & Handover
High-voltage testing, protection relay settings, grid connection approval, and client handover.